Sunday, 25 November 2012
fyp project flow chart
Work Plan
Month of 8 2012:
Task 1 – Inception and conception of the idea
Task 2 – Formulation of the problem, solution and scope
Task 3 – Complete requirement analysis
Task 4 – Finish the project proposal
Task 5 – Background research and design overviews
Task 6 – Research and contact possible vendors available for future
construction
Month of 10 2012:
Task 1 – Reassess the requirements and the solution
Task 2 – Reform the ideas to convert them into concrete components of the
bigger solution
Task 3 - Obtain all parts and components from vendors
Task 4 – Reform the technical writing in accordance with the projected ides
Task 5 – Start working on building the proposed system
Month of 01 2013:
Task 1 – Build a working model of device
Task 2 – Test and add final touches to device as it stands - outside of a
car
Task 3 – Troubleshoot and finalize any problems once installed
Task 4 – Submit working design and reports along
with the presentation
Wednesday, 7 November 2012
Problems Encountered
During the research of the effects of the analysis on the formation of sediment retention, I have problems with the anlysis of the power was producing by absober situation as the example of this type absober have a very complicated anylysis that i can not understand.I have to. However the project is still on schedule and will proceed as how the project was planned
Work to be Completed by Nov 08, 2012
Next, I need to finish the section of strg form. The background - summary of recent research activities in this area.I should Brief explanation of hydraulic or gas shock absorber systems. Indicate the amount of wasted energy released by the absorbers also t some diagrams, charts to show that the energy can be harvested.a litle bit of literiture review.Explain why this research is important.
2. Methodology - Explain the scope of this research. Using some diagrams including the proposed designed absorber and explain how the project will be implemented.
3. Outcomes - shall also include producing prototypes and publication. I will then write the conclusion and management implications for the final paper. The entire project should be completed by the this week of Nov 2012.