Tuesday, 29 January 2013

week 2...2013


        For this week, week 2, I have bought the equipment that I need in my project. By this week also, I will shown it to my advisor,Sir Basri to verified it. The equipment is correct.

        Besides that, I have to find another equipment to complete my project which is charger controller, rectifier circuit and battery. After discussion with my supervisor, he suggest that I should buy charger controller with have current is 1Ampere where it cost RM60. And the battery needed is 12V with 2.6Ampere and it cost average RM50. 

     Furthermore, I also have to check that charger controller that I wanted to buy is matching with the battery. Otherwise, it cannot perform smoothly. For precaution, I have to make sure I will buy correctly by asking the technician of the shop.

     In addition, for the rectifier circuit, the diodes use is depends on the input which mean the photovoltaic itself and also the thermoelectric. This is why data sheet is important. Overall, my project will starting by this week and hopefully everything is in track.

came back to school 2013

     After a long rest for the holiday i will begin this semester, I have to start build my prototype. By referring to the schedule I have made, this week I have to find the equipment needed for my project for example,gear and rack also the main absober. Moreover, I have to find and search  more information about it. For the software, I have to install LabVIEW in my laptop  first. I have to make step by step so that I know that I am still on track and will make sure this project will complete by the end of the semester. HOPEFULLY :)

Sunday, 25 November 2012

block diagram




fyp project flow chart



Work Plan

Month of 8 2012:
Task 1 – Inception and conception of the idea
Task 2 – Formulation of the problem, solution and scope
Task 3 – Complete requirement analysis
Task 4 – Finish the project proposal
Task 5 – Background research and design overviews
Task 6 – Research and contact possible vendors available for future construction

Month of 10 2012:
Task 1 – Reassess the requirements and the solution
Task 2 – Reform the ideas to convert them into concrete components of the bigger                         solution
Task 3 - Obtain all parts and components from vendors
Task 4 – Reform the technical writing in accordance with the projected ides
Task 5 – Start working on building the proposed system  


Month of  01 2013:
Task 1 – Build a working model of device
Task 2 – Test and add final touches to device as it stands - outside of a car
Task 3 – Troubleshoot and finalize any problems once installed
Task 4 – Submit working design and reports along with the presentation 

fyp flowchart


grantt chart